Annual Report of the Archaeological Survey of India 1925–26 c4.s2.4
Annual Report of the Archaeological Survey of India 1925–26 c4.s2.4
- Language
- English
c4.s2.4
For the temporary accommodation of these officers and their staffs during a single winter season nothing more was required than their own camps and these they were able to bring with them but for a continuous and systematic campaign extending over many years it was indispensable that a permanent laboratory museum offices store and work rooms should be provided as well as residential quarters for the officer in charge and his assistants who were to remain on the spot during the summer time It was also necessary that communication between the camp and the nearest railway station at Dokri 8 miles distant should be secured by the construction of a driving road between the two places All this meant considerable outlay before the actual work of digging could begin Thanks however to the liberality of the Bombay Government and to the interest shown in the project by H E Sir Leslie Wilson the construction of this road was taken in hand and completed during the summer of 1925 and the most essential buildings were ready for occupation by the beginning of December And here I would offer my grateful acknowledgment to the local Public Works Department in Sind for the expedition with which after many initial difficulties and delays it eventually pushed through the erection of these structures To Mr K N Dikshit my Superintendent in the Western Circle my thanks are also due for the assistance that he rendered over the preliminary preparations throughout the summer and autumn of 1925 As stated above Mr Dikshit had already been excavating for a season (1924 25) at Mohenjo daro on a quasi independent footing and not unnaturally felt some disappointment when it was decided to extend the scope of the operations and place them under other control In spite of his disappointment however he threw himself into the new scheme with praiseworthy energy and afforded much help over the getting together of the requisite labour material supplies etc Unfortunately after the excavations had started his health broke down he lost heart in the work and eventually withdrew on medical leave before he could complete the plans or write up the report Recently however Mr Dikshit has supplied me with a rough note on his section of the digging and this note has been utilised by Mr Ernest Mackay in writing up the account given below of the DI area