Pramāṇa · Search · About · API

History of Aurangzib, Based on Original Sources v1.c10.50

History of Aurangzib, Based on Original Sources v1.c10.50

Language
English

v1.c10.50

Despite a heavy fire from the fort guns, three covered lanes were carried to the edge of the ditch by 4th July. From one of these a transverse was dug along the bank to the front of the Khwajah Khizir gate. Windows were opened in this and through them earth and tree loppings were flung into the ditch to form a bridge, (2nd August). An underground channel was dug which partly drained the ditch and lowered the water-level by one yard. Another mine was carried under the ditch till it reached the base of the outermost wall.*